November 2017
Provision of a DIVING SME - EOG RESOURCES TRINIDAD LTD
STTL provides the DIVING SME for the OSPREY Jacket Bracing Demobilization
October – December 2017
ROV Inspection - BHP BILLITON (TRINIDAD & TOBAGO)
STTL completes Canteen-1 & Kairi-1 remediation and integrity inspection (Angostura Field Development) utilizing the HOS WARLAND.
November – December 2016
Provision of a DIVING SME – EMAS CHIYODA
STTL provides the DIVING SME to assist in client’s scope in ANGOSTURA Field
July 2016
Provision of Engineering SME and Client Rep – EOG RESOURCES TRINIDAD LTD
STTL provides Engineering SME and Client Rep for pipeline pre-commissioning work to perform operations on SERCAN Pipelay Scope
July - December 2016
Provision of a Client Vessel Rep – BPTT
STTL provides the DIVING SME to assist in client’s scope in ANGOSTURA Field onboard the C-PIONEER
September 2013
ROV Inspection Scopes for BRITISH GAS (BGTT)
BIDCO LTD completes ROV Inspection Scopes for BGTT on various platforms - POINSETTA, DOLPHIN, HIBISCUS
BIDCO LTD facilitates the WINCH change-out for Oceaneering Intl, Inc (OII) on board the OCEAN LEXINGTON. Project completed within tight time-frame and without incidents.
BIDCO LTD assets are merged into DELTA SUBSEA LLC and the new local entity SUBSEA TRINIDAD & TOBAGO LTD is created to manage the Caribbean/ South American portfolio
BIDCO LTD provides fabrication and welding services as required for OCEANEERING INTL INC (OII) on board the Ocean Lexington.
BIDCO LTD works with Oceaneering International Inc. (OII) to perform BHP Billiton's Calm Buoy Hose Change Out using the DPDSV "OCEAN PATRIOT." The job is a success with over 10,000 safe man hours worked incident-free!
BIDCO LTD provides SNC-LAVALIN with Certified Welding Inspectors (CWIs) and NACE-Certified Coating Inspectors for the PDVASA 36" DRAGON Pipeline Project.
Provision of SME (Subject Matter Expert) in Diving and replica watches ROV Subsea Installation field for the CHEVRON/ BGTT DOLPHIN Conductor Clamp Installations
BIDCO LTD was awarded an extension for a BPTT CAD Designer and Animator to assist them with deepwater subsea field development of the upcoming JUNIPER project.
BIDCO LTD awarded and completed ROV detailed inspections of EOG's Ibis check valve and manifold system with its in country LWC ROV system complete with TMS.
BIDCO LTD awarded and completed SAR of an installation aid for EOG Resources in 275' of water with its LWC ROV system operating from BIDCO LTD's DPDSV vessel.
BIDCO LTD is awarded ROV Scopes of work on the SERRETTE Platform for BPTT. BIDCO LTD brings in the POLARBJORN and Lynx LWC ROV and successfully completes job within one month. BIDCO Ltd is an IMCA ROV Contractor and starts its ROV program with more than 50% local content in the ROV department.
BIDCO LTD opens operations in Trinidad & Tobago and provides EOG Resrouces with Certified Welding Inspectors and NACE Coating Inspectors - working onboard the HELIX CAESAR.